Frequently Asked Questions
Specific requirements depend on the local council. Please consult your local council before commencing any work.
Typically,the assembly process about 2 weeks for a team of 3-5 builders and requires a similar. This efficient assembly process one of the key benefit of The Lodge’s innovative design.
Our containers are brand-new Single Voyage units, specially customised for Ready Homes with full-opening doors at both ends.During construction, the container may be used for material storage or as a site office. Upon project completion, you may purchase the\ container for NZD $7,500 and repurpose it for storage or other uses. Otherwise, we will arrange for its removal from site.
Your site must be levelled and cleared of obstructions. Footings or foundations should be prepared by a licensed builder based on our specifications.
This depends on your local council. We recommend checking with your council before starting construction to confirm requirements.Under current New Zealand regulations, even though houses with a floor area of 70 square meters or less may be exempt from requiring building consent or resource consent in some cases, construction must still be carried out by appropriately licensed professionals.This includes engaging a Licensed Building Practitioner (LBP), as well as certified plumbers and electricians, who are responsible for the works and must provide final sign- off upon completion.
The Lodge is constructed from durable high quality materials and as with any house the usual levels of routine maintenance will be required.
Sure, you can (post-delivery) – but we do not offer any customisation to our standard plans. You would need to consult a builder, architect, and engineer regarding any future extensions or modifications.
The Ready Homes team will work with you throughout the building process, liaising with partner certifiers, engineers and service providers as required. We will supply all necessary documentation to support certification and building consent to obtain your Code Compliance Certificate (CCC). We remove the unnecessary stress and simplify the process so you can focus on other priorities.
While all homes can be modified by a licensed builder, we cannot guarantee a modified unit will achieve certification or council approval. If you are seeking a custom solution,we recommend you speak to your builder or certifier before making any changes.
Yes and we DO NOT require concrete slabs! Our range of engineered footing systems ensures that sloping sites can be easily accommodated. Note: footing costs are not included in product pricing and may incur additional cost depending upon site specifics.
- Living rooms :2.7m
- Kitchens and bedrooms:2.4m
- Bathrooms :2.4m
No.Heating and cooling options are provided on an individual basis to suit your site and personal requirements.We’ll work with you to determine the most suitable energy solution for your project.
Yes,power points for appliances are provided (e.g.for washer,dryer ,fridge ,convection microwave).Appliances are not included.
If your site is not connected to a town sewer system, you will likely require a septic system. In this case, you will need to undertake a Land Capability Assessment and confirm local council requirements. We recommend engaging a local plumber to assist with this process.
Yes,solar panels can be fitted to your new home. Solar systems are an excellent way to reduce environmental impact, lower energy consumption, and achieve long-term savings on power costs.
Parking requirements depend on local council regulations. Additional parking may not be necessary for lots with two existing spaces.
Smaller allotments may have additional council-specific requirements. In some cases, a Resource Consent may be required.
- Structural Components – 15 Years
- External Weather-tightness System – 10 Years
- Frames – 15 Years
- Glazing – 7 Years
- Plumbing System – 5 Years
- Electrical System & Light Fittings – 2 Years
- Joinery Hardware – 2 Years
- Floor Finishes – 2 Years
- Appliances – Manufacturer Warranty Applies
Yes, insurance must be obtained by the licensed builder or owner-builder. Costs and application processes vary.
- Certification package
- Application fees
- Connection of services – power / water / wastewater
- Site preparation / earthworks
Request a preliminary desktop assessment. This process assesses eligibility for a fast-track planning pathway. If eligible, Resource Consent may not be required. If not eligible, the project can still proceed but will require consent.
Not necessarily, but the full project scope must be assessed. A tailored approval pathway will be required depending on the specifics.
Structure :Steel beams with lightweight steel floor joists.
Walls :Lightweight steel frames structural
Roof :Lightweight steel framing.